Strategic
Report
Mission of the Company is to ensure reliability, availability and advanced development of Kazakhstan energy system
About
the Company
The information about the Company is available on official website https://www.kegoc.kz/en/about/
Business Model
Our assets:
- 81 substations with the installed transformer capacity of 38,742.9 MVA
- 26,973.228 km of OHTLs
- 9 MES branches and NDC SO
- 4,400 employees
- Modern technologies
Our business:
- Electricity transmission 54.65 billion kWh
- Technical dispatch control 105.04 billion kWh
- Generation and consumption balancing 105.04 billion kWh
Our performance:
- Net profit KZT 52.6 billion
- Dividends per share KZT 75.01 for 2020 / KZT 84.72 for H1 2021
- Share price as on 31 December 2021 KZT 1,885
- Reliability indicators WWP 98.60%, SML 4.46 minutes
- Social Stability Rating 85%
Key SDGs
Mission:
Ensure reliability, availability and advanced development of the energy system of Kazakhstan
Values
Loyalty and honesty
Improvement and challenge
Goodwill and responsibility
Heritage and Trust
Vision
Leader in the electric power industry, contributing to the future energy system and the market changes in the context of an energy transition; and to the development of a sustainable electricity system through infrastructure planning and clean energy development
Capacities
The main asset of the Company is the national power grid (NPG), which at the end of 2021 consisted of 384 overhead power transmission lines (OHTL) of 0.4–1150 kV with a total length of 26,973.228 km (ckt) and 81 electrical substations (SS) of 35–1150 kV with an installed transformer capacity of 38,742.9 MVA. They serve to provide cross-border power flows, to supply power from the power plants, and link regional power companies to large consumers.
Length of KEGOC OHTLs
31 December
2021
Capacity and number of KEGOC’s substations
31 December
2021
Company Structure
The Company’s structure includes 9 Inter-system Electric Networks (MES) branches, and National Dispatch Centre of System Operator (NDC SO), also as a branch of the Company.
KEGOC is the sole shareholder of EnergoInform, a subsidiary.
The mission of Energoinform JSC is to ensure the reliable functioning and efficient development of the information and telecommunications systems in UPS using the global best practices and innovative technologies.
The main activity is the maintenance of KEGOC’s information and telecommunication complex, including: commercial metering system, SCADA, balancing electricity market, information management system, PLC, radio relay links, satellite communication, guaranteed power supply, branch exchange, fibre optic links, fire and security alarm systems and corporate services.
On 30 December 2021, FSC RES LLP is alienated by transferring 100% of the participatory interests owned by KEGOC to the state ownership free of charge.
Geography
of Operations
Development
Strategy
KEGOC’s operations have strategic importance for the development of the entire economy of Kazakhstan and affect the interests of a wide range of stakeholders, and the Company takes this into account when making decisions and building a long-term strategy. The focus of our attention is to be attentive to the interests of the society and ensure outstripping development of the NPG of Kazakhstan, ensure decent working conditions and well-being of people, and care for the environment. This is reflected in KEGOC’s Development Strategy.
The State has assigned to KEGOC the status of the system operator of the UPS of Kazakhstan, which defines the functions of KEGOC to ensure parallel operation with the energy systems of the neighbouring countries, maintain the balance in the energy system, provide system services, and purchase ancillary services from the wholesale electricity market entities, as well as to ensure the transmission of electricity through the NPG of Kazakhstan, provide for its maintenance and operational availability.
Long-Term
Strategic Goals
Goal 1: Ensure reliable operation of the UPS of Kazakhstan, i.e., quality delivery of the functions of the System Operator of the UPS of Kazakhstan; quality maintenance, repair and modernisation of the existing assets; increase the capacity of the NPG of Kazakhstan through construction of new transmission lines and substations; technological development and digitalisation of the business.
Goal 2: Ensure the effective operation of KEGOC through higher efficiency of invested capital and development of new businesses, implementation of KEGOC’s Transformation Programme and development of international cooperation.
Goal 3. Enhance corporate governance and sustainable development through better health and safety management, enhanced corporate governance, human capital development and environmental protection..
The development strategy is available on official website: https://www.kegoc.kz/en/about/strategiya-razvitiya/
KPIs for Goal 1
KPI | 2019 actual |
2020 actual |
2021 plan |
2021 actual |
WWP, % | 99.64 | 98.63 | 98.55 | 98.60 |
SML, minutes | 0.52 | 5.21 | 0.96 | 4.46 |
KPIs for Goal 2
KPI | 2018 actual |
2019 actual |
2020 actual |
2021 plan |
2021 actual |
EBITDA, KZT billion | 81.2 | 88.5 | 108.4 | 94.1 | 93.9 |
NAV, KZT billion | 416.2 | 422.2 | 441.2 | 489.2 | 486.3 |
KPIs for Goal 3
KPI | 2018 actual |
2019 actual |
2020 actual |
2021 plan |
2021 actual |
LTIFR, coefficient | 0.29 | 0 | 0 | 3.40 | 0.15 |
Frequency of fatal occupational accidents, ratio | 0.25 | 0 | 0 | 0 | 0 |
Corporate governance rating | ВВ | ВВ | ВВ | ВВВ | ВВВ |
Future
Plans
On 21 December 2021, KEGOC’s Board of Directors approved KEGOC Development Strategy for 2022-2031. The Development Strategy is a long-term strategic document, which defines the Company’s Vision and Mission and strategic areas of KEGOC development for the long-term period. The Development Strategy addresses the issues of the long-term sustainable development of the Company such as the global trends of energy transition and integration of renewables, and the emerging medium-term electricity and capacity shortages in Kazakhstan. It also includes the important issues of introduction pf modern innovative and digital technologies, R&D, commitment to ESG principles, and covers processes related to decarbonisation of the economy and ensuring economic growth in the country.
KEGOC expects an increase in electricity consumption and production in the future, which will have a positive impact on the volume of electricity transmission and regulated services provided by the Company.
KEGOC will continue to upgrade and develop its assets to ensure the reliable operation of the UPS of Kazakhstan and enhance its performance KPI, such as grid availability, average interruption time (AIT), electricity not supplied (ENS) and customer satisfaction with system services.
KEGOC’s future sustainable development will be ensured through further improvement of corporate governance and occupational health and safety management system, increasing the Company’s responsibility for environmental protection in accordance with the plans and programmes developed.
Key performance indicators, or KPIs, reflect the achievement of the Company’s strategic goals and objectives, as well as the effectiveness of its operations.